March 12th, 2008
sluice wall coatingsluice chamber coatingSluice & Influent - concrete coating rehab - Using an Epoxytec certified applicator, Miami-Dade Water & Sewer awarded a contract to rehabilitate and protective line the North District pretreatment sluice chamber and influent pipe.

February 2nd, 2003
uroflex seafoampump stationsSewer Lift Station #685 - concrete rehab and protection - Miami-Dade Water & Sewer's Lift Station Department tackled the rehabilitation and lining of a master lift station after extreme deterioration and corrosion.

December 7th, 2002
exposed concretecoated concreteWWTP Final Settling - rehabilitation - Miami-Dade Water & Sewer have developed a self-performing program to tackle the repair and coating of final settling trough and walls of their Central District WWTP.

January 13th, 2002
coating anaerobicH2S protectionWastewater Closed O2 Anaerobic Digester - concrete rehab & lining - Ultra-high hydrogen sulfide corrodes concrete in closed UNOX tanks at an accelerated pace, leaving rebar exposed concrete and spalling.  Epoxy repair were made for structural repair, and a high performance lining system was applied in-house for long term service protection.


Uroflex Archives 1 /

for more videos, visit Epoxytec TV
Spraying Uroflex (pipe)


Product Type
Application / Function Type
Special Requirements
      View All

Follow US ON

WE ARE MEMBERS OF

NACE International The Society For Protective Coatings
The National Association of Sewer Service Companies The Florida Rural Water Association
The Florida Water & Pollution Control Operators Asociation
Home | Featured Projects | Site Map | Order | Contact Us

© Copyright 2004 - 2010 . All rights reserved . EPOXYTEC International, Inc.